- BSC/BTS/Transmission Installation
BSC/BTS/Transmission equipment and accessories installation based on customer’s design and installation standard.
- BSC/BTS/Transmission Integration & Commissioning
The final check of all equipment functionality and performances and comparation between the actual installation against the original design/installation binder and ATP as per the customer’s standard.
- Site Quality Audit
Site Quality Audit Installation is conducted to check the quality of installation equipment workmanship on site. This service is as an optional service required by customer.
|
 |
|
 |
|
|
|